My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-06_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2015-03-06_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:06 PM
Creation date
3/6/2015 12:20:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/6/2015
Doc Name
Cost Estimate
From
Jim Stark
To
Rob Zuber
Type & Sequence
TR104
Email Name
RDZ
JRS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # TR104AOI Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade ETD Pond 1 <br />Permit Action: Technical Revision <br />Site: Colowyo Coal Mine 104 <br />PROJECT IDENTIFICATION <br />Task #: TRI04AOI State: Colorado <br />Date: 3/6/2015 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C1981019 <br />Abbreviation: None <br />Filename: C019- TRI04AOI <br />Total unit Cost /Hour: $272.98 <br />Total Fleet Cost/Hour: $272.98 <br />MATERIAL OUANTITIES <br />Initial Volume: 500 <br />Swell factor: 1.125 <br />Loose volume: 563 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly production: 1,514.3 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />10% <br />6,800 feet <br />2,650 lbs /LCY <br />rock - 25% Rock, 75% Earth <br />Utilization % <br />Ownership Cost /Hour: <br />$81.29 <br />NA <br />Operating Cost/flour: <br />$143.16 <br />100 <br />Ripper op. Cost /Hour: <br />$10.52 <br />100 <br />Operator Cost /Hour: <br />$38.01 <br />NA <br />Total unit Cost /Hour: $272.98 <br />Total Fleet Cost/Hour: $272.98 <br />MATERIAL OUANTITIES <br />Initial Volume: 500 <br />Swell factor: 1.125 <br />Loose volume: 563 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly production: 1,514.3 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />10% <br />6,800 feet <br />2,650 lbs /LCY <br />rock - 25% Rock, 75% Earth <br />
The URL can be used to link to this page
Your browser does not support the video tag.