My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-04_REVISION - M1985112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2015-03-04_REVISION - M1985112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:22 PM
Creation date
3/4/2015 4:21:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
REVISION
Doc Date
3/4/2015
Doc Name
Supplemental Application Materials AM01
From
John S. Vazquez, P.E.
To
DRMS
Type & Sequence
AM1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />MINE PLAN <br />The Loloff Pit is an operational sand and gravel mine, with this application being for the expansion of the <br />existing reclamation boundaries to include approximately five (5) acres of additional mining area. The <br />site is approximately 55.17 acres with 42.7 acres of reclaimed area currently permitted under Permit M- <br />1985 -112 on file with the Colorado Division of Reclamation Mining & Safety. The permit area of 55.17 <br />acres shall remain unchanged, however, the mine and reclamation limits are proposed to be increased <br />with this amendment. <br />Exhibit C shows the current permitted mining area and Exhibit D shows the proposed areas to be <br />affected under the amendment to the reclamation permit. The affected areas include Area 1 in the <br />northeast corner of the property that was identified as a shop and storage area in the original permit <br />application. The property ownership changed hands over the two years and it is the new owners desire <br />to mine this area as it contains approximately 450,000 tons of material with an average depth of 45 feet <br />in the northeast corner. The other area where the modified mine boundaries are being requested is in <br />the south west corner of the property identified on the map,as Area 2. This area was disturbed by <br />previous operators and this amendment includes this disturbance. This amendment shall accommodate <br />the minimum offsets while maximizing the water storage volume for post reclamation use. This area is <br />not a mining area as much as it is an amendment to the reclamation plan. The modifications proposed <br />in Area 2 do not create any additional encroachment of existing structures. This area of impact is <br />approximately 0.25 acres and there is not any significant depth of material. <br />The current method of mining is a dry mining operation with de- watering occurring in the southeast <br />corner of the property. De- watering trenches have been excavated and the sand and gravel is <br />subsequently mined using an excavator to load haul trucks to haul material to a stockpile to feed the <br />crusher plant. The crusher plant is loaded with front end loaders and the final product of road base will <br />be loaded into trucks with front end loaders from a stockpile. The pit is currently mined in areas of 15- <br />20 acres at a time with 5 -10 feet of depth of material. Stability analysis were performed with the Loloff <br />Pit Permit M- 1985 -112 Technical Revision No. 1 and all mining techniques submitted with TR -01 will <br />apply to the amended areas to be mined. The results of the stability analysis have been attached for <br />your review. There is no use of explosives on this site and there are no explosives to be stored on site. <br />The material being mined currently is sand and gravel that is crushed and screened to create various <br />road base products or it is sold as pit run and used for construction materials. These construction <br />materials are being utilized in the oil and gas fields for pad site construction and with the current market <br />in new site development, the intended timeline for the completion of the reclamation of the pit is 2017, <br />but is subject to change as the industry changes. It should be noted that the slopes are being graded to <br />the final reclamation slopes as mining operations are on- going. It is the owner's intent to have a slurry <br />
The URL can be used to link to this page
Your browser does not support the video tag.