Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one): <br />0 Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />DResidential(RS) Recreation(RC) <br />Industrial /Commercial(IC) <br />✓ Developed Water Resources(WR) <br />Solid Waste Disposal(WD) <br />13. Primary present land use (check one <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck - shovel): <br />Open pit mine with loaders, trucks, excavators, and dozers. <br />15. On Site Processing: Crushing,Screening <br />13.1 Briefly explain mining method (e.g. truck'shovel): <br />Cone crusher fed by loaders and conveyors. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation. provide a brief narrative describing the proposed change(s). <br />The Loloff Pit is currently permitted for approximately 55.17 acres and we are proposing to <br />ec ama Ion Plan. I he additional was a proposed sop and storage area that has never been <br />used as such. Loloff Construction, Inc. would like to mine the additional area. <br />