Laserfiche WebLink
RE: Technical Revision request for Star Water Resource, Permit # M- 1977 -522 <br />Reclamation Phases Timetable (Revised February -2015) <br />The numbers presented below represent our estimate of the various areas of disturbance in the mine <br />area. They are based on current conditions at the mine. <br />Table E -1: Reclamation Phases (As- Built) <br />Area <br />Years <br />ACRES t <br />TOTAL <br />LAKE <br />AREA <br />REVEGE- <br />TATION <br />ROAD & <br />STAGIN <br />G AREA <br />MISCELLANEOUS AREAS <br />(DITCHES, UNDISTURBED, <br />RECLAIMED AREAS, ETC.) <br />Eastern Phase <br />3 -5 <br />28.08 <br />8.28 <br />8.72 <br />3.95 <br />7.13 <br />Western Phase <br />3 -5 <br />53.19 <br />35.59 <br />5.73 <br />7.83 <br />4.04 <br />Varra Property <br />0 -1 <br />9.36 <br />0.00 <br />0.00 <br />0.00 <br />9.36 <br />Totals <br />90.63 <br />43.87 <br />14.45 <br />11.78 <br />20.53 <br />Note: The 8.28 total acres of water surface area in the Eastern Phase= <br />6.10 acres of pre -1981 water surface + 2.18 acres of post -1981 water surface. <br />STAR - DRMS -TR -letter &maps- 021615.docx <br />