PERMIT #: M- 1997 -058 <br />INSPECTOR'S INITIALS: ECS <br />INSPECTION DATE: February 24, 2015 <br />OBSERVATIONS <br />This was a surety reduction (SR) inspection conducted by DRMS at the Bestway Concrete Baseline Resource <br />site. This site is located near the intersection of WCR 2 (Baseline Road) and WCR23 immediately northwest of <br />Brighton in Weld County. There are 209.6 acres currently permitted at this 112c site. The inspection was <br />conducted by Eric Scott of DRMS. The DRMS representative met with permittee representative Mark Johnson <br />of Bestway Concrete at the site office at approximately 0900. <br />Mining is still active in the south and east area of the permit and reclamation is well underway on the rest of <br />the permit area. The slurry walls around the reservoir portions of the permit have been completed and <br />approved by the SEO's office. The western reservoir embankment has been graded, prepped and seeded, <br />however, due to difficult growing conditions last season the vegetation did not establish. Reseeding will likely <br />be needed. There is significant earthwork /grading remaining to be completed on the eastern reservoir as <br />mining is completed in this area prior to re- vegetation. There is also a small area of exposed groundwater <br />(settling pond) near the center of the site that will need to be backfilled to at least two feet above static water <br />level. The existing bond posted for this site, $711,750 will likely be adequate to complete reclamation if <br />required. <br />On January 20, 2015 a SR revision (SR04) was requested by the permittee based on the previous approval of <br />the slurry wall by the SEO, and the limited nature of the remaining reclamation required at the site. DRMS <br />believes that due to the remaining earthwork required to clean out the east reservoir, re -slope the east <br />reservoir embankment, backfill the settling pond, replace the topsoil and re- vegetate the site, that the surety <br />reduction as proposed is not approvable at this time. The bond proposed in SR04 as provided ($32,060) would <br />be insufficient to reclaim the existing disturbance at the site. <br />The permittee should provide a revised reclamation estimate that includes estimated costs for at least the <br />above items, as well as any additional disturbance planned within the next 12 months and the standard <br />indirect costs to DRMS by Friday, March 13 if the SR process is to continue. The permittee may also withdraw <br />the SR02 request for this site and leave the current bond in place. <br />Inspection Contact Address <br />Mark Johnson <br />Bestway Concrete Company <br />301 Centennial Dr. <br />Milliken, CO 80543 <br />Page 2 of 2 <br />