Laserfiche WebLink
2.05.3 (3) <br />Mine Facilities ............................................................................ ............................... 95 <br />2.05.3 (4) <br />Operation Plan — Ponds, Impoundments, and Diversions ........... ............................... <br />96 <br />2.05.3 (5) <br />Topsoil ........................................................................................ ............................... <br />96 <br />2.05.3 (6) <br />Overburden ................................................................................. ............................... <br />98 <br />2.05.4(l) <br />Reclamation Plan ...................................................................... ............................... <br />102 <br />2.05.4 (2)(a) <br />Reclamation Timetable ............................................................. ............................... <br />102 <br />2.05.4 (2)(b) <br />Reclamation Costs .................................................................... ............................... <br />103 <br />2.05.4 (2)(c) <br />Backfilling Plan ........................................................................ ............................... <br />103 <br />2.05.4 (2)(d) <br />Topsoil Salvage ......................................................................... ............................... <br />103 <br />2.05.4 (2) (e) <br />Reclamation Revegetation ........................................................ ............................... <br />104 <br />2.05.4(f -h) <br />Disposal, Mine Openings, Water and Air Control .................... ............................... <br />104 <br />2.05.5 <br />Post - Mining Land Uses ............................................................ ............................... <br />104 <br />2.05.6 <br />Mitigation of Impacts of Mining Operations ............................ ............................... <br />106 <br />2.05.6(l) <br />Air Pollution Control Plan ........................................................ ............................... <br />106 <br />2.05.6 (2) <br />Fish and Wildlife Plan .............................................................. ............................... <br />106 <br />2.05.6 (3)(a) <br />Protection of the Hydrologic Balance ....................................... ............................... <br />106 <br />2.05.6 (3)(b)(i & <br />ii) Hydrologic Controls ................................................................. ............................... <br />108 <br />2.05.6 (3)(b)(iii) <br />Probable Hydrologic Consequences ......................................... ............................... <br />108 <br />2.05.6 (4) <br />Protection of Public Parks and Historic Places ......................... ............................... <br />120 <br />2.05.6 (5 -6) <br />Surface Mining near Underground Mining; Subsidence Control ............................ <br />120 <br />2.06 <br />PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES ......................... <br />121 <br />2.06.1 -3 <br />Scope, Experimental Mining, and Mountain Top Removal ..... ............................... <br />121 <br />2.06.4 <br />Steep Slope Mining ................................................................... ............................... <br />121 <br />2.06.5 <br />Variance from Approximate Original Contour Restoration Requirements ............. <br />121 <br />2.06.5 (2) (a) Post <br />- Mining Land Use ......................................................................... ............................... <br />121 <br />2.06.5 (2) (b) Consultation with Planning Agencies ................................................. ............................... <br />121 <br />2.06.5 (2) (c) Alternative Postmining Land Uses ...................................................... ............................... <br />121 <br />2.06.5 (2) (d) Watershed <br />Improvements .................................................................... ............................... <br />122 <br />2.06.5 (2) (e) Owner Approval .................................................................................. ............................... <br />122 <br />2.06.5 (2) (f) Compliance with Limited Variances ................................................... ............................... <br />122 <br />2.06.6 <br />Prime Farmlands ....................................................................... ............................... <br />122 <br />2.06.7 <br />Reclamation Variance ......................................... ............................... ...................... <br />122 <br />2.06.8 <br />Alluvial Valley Floor (AVF) .................................................... ............................... <br />124 <br />2.06.9 <br />Augering and Highwall Mining ................................................ ............................... <br />128 <br />2.06.10- 2.06.11 <br />Processing Plants, In -Situ Processing ....................................... ............................... <br />128 <br />2.06.12.1 <br />Coal Refuse Piles ...................................................................... ............................... <br />128 <br />2.07-2.10 <br />VARIOUS .................................................................................... ............................... <br />128 <br />RULE 3 — PERFORMANCE BOND ............................................................................ ............................... <br />1 <br />RULE 4 — PERFORMANCE STANDARDS ............................................................... ............................... <br />1 <br />4.02 <br />SIGNS AND MARKERS ................................................................ ............................... <br />1 <br />4.02.1 <br />Specifications .......................................... ............................... <br />4.02.2 <br />Mine and Permit Identification Signs ........................................... ............................... <br />1 <br />4.02.3 <br />Perimeter Markers ......................................................................... ............................... <br />1 <br />4.02.4 <br />Duration of Maintenance .............................................................. ............................... <br />1 <br />4.02.5 <br />Stream Buffer Zone Markers ........................................................ ............................... <br />1 <br />4.02.6 <br />Blasting Signs ............................................................................... ............................... <br />1 <br />4.02.7 <br />Topsoil Markers ............................................................................ ............................... <br />2 <br />4.03 <br />ROADWAYS ................................................................................... ............................... <br />2 <br />4.03.1 <br />Haul Roads .................................................................................... ............................... <br />2 <br />4.03.2 <br />Access Roads ................................................................................ ............................... <br />2 <br />4.03.3 <br />Light -Use Roads ........................................................................... ............................... <br />3 <br />South Taylor /Lower Wilson - ii Revision Date: 10/31/13 <br />Revision No.: MR -129 <br />