My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-03_INSPECTION - M2000052
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000052
>
2015-03-03_INSPECTION - M2000052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:58 PM
Creation date
3/4/2015 8:47:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000052
IBM Index Class Name
INSPECTION
Doc Date
3/3/2015
Doc Name
Corrective Action Responsw
From
DRMS
To
RMMA
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summary (To be added to 2015 Update) <br />Permit Action: Highwall <br />Site: Coyote Ridge Knockdown Permit/Job #: M2000052 <br />PROJECT IDENTIFICATION <br />Task #: X00 State: Colorado <br />Date: 3/3/2015 County: Fremont <br />User: TC1 <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M052 -X00 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />X01 <br />CutBackfill Highwalls to 311: IV <br />DOZER <br />1 <br />14.56 <br />$1,996.00 <br />SUBTOTALS: <br />14.56 <br />$1,996 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$40.32 <br />Performance bond: <br />1.05% <br />Total = <br />$20.96 <br />Job superintendent: <br />7.28 hrs <br />Total = <br />$547.16 <br />Profit: <br />10.00% <br />Total = <br />$199.60 <br />TOTAL O & P = <br />$808.04 <br />CONTRACT AMOUNT (direct + O & P) = <br />$2,804.04 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00% <br />Total = $0.00 <br />Reclamation management and/or administration: <br />5.00% <br />$140.20 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $948.24 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,944.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.