Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # X01 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Cut/BackfdI Mghwalls to 3HAV <br />Site: Coyote Ridge Permit Action: Highwall Knockdown Permit/Job #: M2000052 <br />PROJECT IDENTIFICATION <br />Task #: X01 <br />Date: 3/3/2015 <br />User: TC 1 <br />State: Colorado <br />County: Fremont <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D6T XL <br />Horsepower: <br />200 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M052 -X01 <br />Total unit Cost/Hour: $137.10 <br />Total Fleet Cost/Hour: $137.10 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,604 <br />Swell factor: 1.330 <br />Loose volume: 3,463 LCY <br />Source of estimated volume: Site Photos (2/19/1 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />444.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-5% <br />5,580 feet <br />2,900 lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$34.93 <br />AVG. <br />NA <br />Operating Cost/Hour: <br />$64.17 <br />CAT HB <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />(SLOT) <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />AVG. <br />NA <br />Total unit Cost/Hour: $137.10 <br />Total Fleet Cost/Hour: $137.10 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,604 <br />Swell factor: 1.330 <br />Loose volume: 3,463 LCY <br />Source of estimated volume: Site Photos (2/19/1 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />444.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-5% <br />5,580 feet <br />2,900 lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.200 <br />(SLOT) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />