Laserfiche WebLink
.Of-"'Co O� COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />y� o MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />* <br />1876* <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE /PROSPECTING ID #: <br />MINERAL: <br />COUNTY: <br />Ensminger Pit #2 <br />M- 2010 -036 <br />Clay, gravel, sand <br />Phillips <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Elliott R. Russell <br />November 3, 2014 <br />13:30 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />Rick Ensminger <br />Rick Ensminger <br />112c - Construction Regular Operation <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Priority (SO Application) <br />Complete Bond <br />$47,500.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None ^ <br />None <br />WEATHER: <br />INSPE G , RE: <br />U <br />SIGNATURE DATE: <br />Snowing <br />February 27, 2015 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLO`W'ING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM /POSSIBLE VIOLATION: Problem: The affected area boundary markers are missing or incorrectly <br />placed. This is a problem for failure to maintain boundary markers around the affected area as required by <br />Section 3.1.12(2) of the Rule. <br />CORRECTIVE ACTIONS: The operator shall conduct a survey and replace the boundary markers in the correct <br />locations. The operator shall provide coordinates and photographic proof of the re- established markers to the <br />Division by the corrective action date. <br />CORRECTIVE ACTION DUE DATE: 3/29/15 <br />Page 1 of 6 <br />