Laserfiche WebLink
2007 Reclamation Activities: <br />There were no reclamation activities during this reporting period. <br />2006 Reclamation Activities: <br />Bowie Resources LLC began partial reclamation of the Bowie No. 1 Mine Loadout facilities. <br />The partial reclamation project consisted of demolition of the following structures; <br />Three Concrete Silo's <br />Truck Loadout <br />Truck Dump MCC Building <br />Dust Collection System <br />Truck Dump to Silo Belt Structure <br />Silo to Loadout Belt Structure <br />Silo MCC Building <br />Train Loadout Facilities <br />Train Loadout MCC Building <br />Approximately 1,200 feet of railroad track <br />2005 Reclamation Activities: <br />During the reporting year of 2005, Bowie Resources continued with the reclamation of the <br />Bowie #1 West Mine Ventilation shaft site. Reclamation consisted of distributing and grading of <br />topsoil back to its approximate original contour over shaft site. Upon completion of the grading, the <br />entire area was re- seeded with the approved permanent seed mix and covered with straw mats. <br />There were also drill hole sites on the Bowie #1 permit area that were reclaimed in 2005. <br />u <br />