My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-27_REPORT - C1981038
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2015-02-27_REPORT - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:17:23 AM
Creation date
3/2/2015 1:23:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/27/2015
From
Bowie Resources, LLC
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Reclamation Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1993 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1993 calendar year. Reclamation activities conducted included seeding and mulching operations on <br />the outslopes of the west ridge waste pile. (See location 32 on exhibit 7). Topsoil and subsoil piles <br />in the vicinity of the West Ridge waste pile which were disturbed as a result of pile reconstruction <br />activities were seeded with'the temporary seed mix (seed mixture #6 (during the fall of 1993. <br />At the close of 1993 reclamation activities on the West Ridge waste pile, the total reclaimed <br />acreage on this site was approximately 2.85 acres. Of this total acreage, 0.83 acres was newly <br />revegetated in.1993. <br />Approximately 0. 12 acres of additional disturbance occurred in association with a landslide at <br />the west mine portal cut during 1993. Topsoil was salvaged from an area surrounding the slide crest <br />and stockpiled near this location (refer to Exhibit 8 in this report and Map No. 8 -6, Permit No. C -81- <br />038). Disturbed areas associated with this slide and the subsequent stabilization work were seeded <br />with the temporary seed mix (seed mixture #6) mulched. Table 7 of this report depicts reclaimed <br />acreages throughout the mine site has been revised to reflect 1993 activities. <br />1992 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1992 calendar year. Reclamation activities conducted included seeding and mulching operations on <br />the outslopes of the west ridge waste pile. (See location 32 on exhibit 7). Topsoil and subsoil piles <br />in the vicinity of the West Ridge waste pile which were disturbed as a result of pile reconstruction <br />activities were seeded with the temporary seed mix (seed mixture #6 (during the fall of 1992. <br />At the closed of 1992 reclamation activities on the West Ridge pile, the total reclaimed <br />acreage on this site was approximately 2.02 acres. A total of 0.63 acres was newly revegetated in <br />1992 with the remainder having been seeded in 1983. At the close of 1983 reclamation activities on <br />the West Ridge waste pile, the total reclaimed acreage on this site was approximately 2.20 acres. <br />During gob salvage and sale operations occurring in the first and second quarters of 1992, <br />approximately 0.81 acres of seeded topsoil and subsoil was stripped from the pile to allow access to <br />the gob. Table 7 of this report depicting reclaimed acreages throughout the mine site has been <br />revised to reflect this sequence of events. <br />1991 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1991 calendar year. Reclamation activities conducted were primarily confined to interim <br />stabilization seeding and mulching operations on topsoil piles and subsoil piles in the vicinity of the <br />West Ridge waste pile (See exhibit 7). Soil storage piles in this area saw additions of materials due <br />to the topsoil and subsoil stripping operations required to access gob for sale and shipment. Topsoil <br />piles were seeded with temporary seed mix (see mixture #6) and mulched. Subsoil piles were only <br />seeded and were left in a roughened condition to prevent erosion. <br />One additional pile located at the parking lot area (See Exhibit 6) and consisting of <br />windrowed subsoil material isolated for future reclamation purposes was seeded with temporary seed <br />mix in response to NOV 91 -004. <br />
The URL can be used to link to this page
Your browser does not support the video tag.