Laserfiche WebLink
February 24, 2015 C- 1996 - 083 /13owie No. 2 Mine JDM <br />' • x Al <br />.ti <br />_ -�- <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3) /4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance 4.03.1(5) and (6)/4.03.2(5) and <br />(6) Reclamation 4.03.1(7)/4.03.2(7): <br />Roads throughout the site were stable. Actively utilized roads were clear of snow with no problems noted. A small <br />amount of road dust was observed along the edge of the Gob Pile 92 haul road above bench 4. <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 11 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 5 of 5 <br />