Laserfiche WebLink
RECEIVED <br />FEB 1 y Z015 <br />DIVISHiii -. _, cLAMATIIOON, <br />MINING & <br />'P T 1W_ <br />112c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Grand Junction Concrete <br />Pipe Co. <br />Permit Number: <br />M -1981 -243 <br />Operation Name: <br />S Fruita Grav Pit <br />County: <br />Mesa <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />February 16, 2015 <br />Permit Acreage: <br />104.00 <br />Current Bond Amt: <br />$73,972.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12 Total acres in various stages of reclamation, since pennitted mining activities began: <br />9 NO <br />YES NO <br />YES �O <br />YES NO <br />YES LIVQ,� <br />YES X0,1 <br />e6 ;17 <br />C/ <br />`l <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />Z 3 <br />seeded w/ <br />/ <br />` <br />w /topsoil <br />mulched w/ <br />approved mix. <br />' <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />r <br />Mulch application <br />graded: <br />S <br />fertilized w/ <br />--- <br />replacement <br />b <br />rate (tons/ac): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />�r' �/ <br />application <br />Z <br />application <br />method: <br />method: <br />''V <br />method: <br />