My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-26_REVISION - M2008078
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2015-02-26_REVISION - M2008078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:26 PM
Creation date
2/27/2015 8:17:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
REVISION
Doc Date
2/26/2015
Doc Name
Request SR01
From
GP Agregates, LLC
To
DRMS
Type & Sequence
SR1
Email Name
AME
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEVED <br />February 17, 2015 T, i- <br />Ms. Amy Eschberger <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Reclamation, Mining, & Safety <br />1313 Sherman Street — Room 215 <br />Denver, CO 80203 <br />RE. GP Aggregates, LLC. — West Farm Pit — Reclamation Bond Reduction Request, <br />File No. M- 2008 -078 <br />Dear Ms. Eschberger, <br />The West Farm Pit slung wall construction has been completed and the leak test passed and was <br />accepted by the State Engineer's Office (SEO). Todd Yee with J &T Consulting, Inc. sent a copy of the <br />acceptance letter from the SEO, and a copy of the final test report to you via e-mail on February 16, <br />2015. GP Aggregates, LLC (GP) is requesting a reduction in the current Irrevocable Letter of Credit for <br />the financial warranty that is in place for the West Farm Pit for removing the costs associated with <br />constructing the slurry wall. <br />Attached to this letter is the calculation of the reclamation bond reduction for removing the slurry wall <br />construction costs based on the costs and percentages in the DRMS bond calculation for Technical <br />Revision No. 4 for your reference. <br />The current Irrevocable Letter of Credit amount in place for the financial warranty is $678,944.00. <br />Reducing the current reclamation bond amount by the $117,906.94 reduction shown in the attached <br />calculation, the revised Irrevocable Letter of Credit amount should now be $561,037.06. <br />GP appreciates your consideration of this reclamation bond reduction request and looks forward to your <br />response. <br />Please feel free to contact me with any questions or comments. <br />Sincerely, <br />arl Nyquist — Manager <br />f12L GP Aggregates, LLC <br />Attachments: <br />Reclamation Bond Reduction Calculation <br />d AF & Report er <br />-4 No -Volaboj s <br />1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.