My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-17_GENERAL DOCUMENTS - M1977342
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977342
>
2015-02-17_GENERAL DOCUMENTS - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:29 PM
Creation date
2/27/2015 8:15:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/17/2015
Doc Name
Follow-Up Notice
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Molybdenum <br />A Freeport- McMoRan Company . <br />February 17, 2015 <br />Via Email and USPS Priority Mail: 7006 2150 0001 8832 6207 <br />Mr. Peter Hays <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, CO 80203 <br />COLORADO OPERATIONS <br />Henderson Mill <br />19302 County Road 3 <br />Parshall, CO 80468 <br />Phone (303) 569 -3221 <br />Re: Follow -up Notice for Mill Nokes Building Caustic Spills, Permit No. M- 1977 -342 <br />Mr. Hays: <br />Henderson Mill is providing this written follow -up notice to the two successive phone calls made to you on <br />February 11 and February 12th, 2015 pursuant to Rule 8.1 and 8.2 of the DRMS Rules and Regulations. <br />This notice is regarding two unrelated releases of sodium hydroxide solution (NaOH) which escaped from <br />the Nokes building on February 11 "and February 12th, 2015 sequentially. NaOH is a designated chemical <br />in Henderson's Environmental Protection Plan. NaOH is stored in two 11,250 gallon tanks in the Nokes <br />building and is used to neutralize waters in the Mill's lead leach process and to raise the pH of process <br />water in the milling circuit. <br />February 11th - Following transfer operations on February 10, 2015 two valves on water lines leading to the <br />tank were mistakenly left on by the operator. By approximately 2:00 A.M. on February 11, 2015, the tank <br />began overflowing into the building's secondary containment. The overflow was noticed at approximately <br />3:00 A.M. Due to a 480 volt line that was submerged in the overflow solution, the operators were not able <br />to safely turn off the water causing the overflow until approximately 7:30 A.M. At approximately 8:30 A.M. <br />a leak was noticed from the secondary containment on both the North and West side of the building. The <br />NaOH had mixed with snow and melt water at the point of the leakage, preventing immediate recognition. <br />We believe that approximately 500 gallons of diluted material was released from the secondary containment <br />during this event. The material released from the secondary containment flowed approximately 100 yards <br />across asphalt to a storm drain. The storm drain flows through a pipeline which ultimately discharges into <br />the tailing impoundment. The residual material on the asphalt was neutralized and rinsed down the storm <br />drain. The material in the secondary containment was pumped into the Mill circuit. <br />February 121h — On February 121h a tanker truck carrying a full load of NaOH was instructed to offload into <br />the NaOH tanks in the Nokes building. One of the tanks did not have sufficient capacity to hold the volume <br />of the truck and in turn overflowed into the Nokes building secondary containment. We believe that <br />approximately 10 gallons of material was released from the secondary containment during this event from <br />the West side of the building. The final disposition of this material was the same as the February 11h <br />release. <br />(a) After discovering the issue on February 11th, the Henderson Mill Emergency Response <br />Team was called to respond to the situation. As soon as it was safe to do so, the valves on <br />the water lines causing the tank overflow were turned off and the material in the secondary <br />
The URL can be used to link to this page
Your browser does not support the video tag.