My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-26_REPORT - C1982056 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2015-02-26_REPORT - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:45 PM
Creation date
2/26/2015 10:50:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
2/26/2015
Doc Name
Foidel Subsidence Evaluation Part 3(Final)
From
DRMS
To
Nicole Caveny
Type & Sequence
PR10
Permit Index Doc Type
Subsidence Report
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SubTerra, Inc. Peabody Twentymile Coal LLC 09/27/2014 <br />Foidel Creek Mine <br />Permit Revision for Longwall Mining in the Wolf Creek Seam - Subsidence Evaluation <br />(A) Restoration or rehabilitation of structures and features, including approximate <br />land - surface contours, to pre - mining condition. <br />(B) Replacement of structures destroyed by subsidence. <br />(C) Purchase of structures prior to mining and restoration of the land after <br />subsidence to condition capable of supporting and suitable for the structures and <br />foreseeable land uses. <br />(D) Purchase of non - cancellable insurance policies payable to the surface owner in <br />the full amount of the possible material damage or other comparable measures. <br />(v) A detailed description of measures to be taken to determine the degree of material <br />damage or diminution of value or foreseeable use of the surface, including such measures <br />as, <br />(A) The results of pre - subsidence surveys of all structures and surface features <br />which might be materially damaged by subsidence. <br />(B) Monitoring, if any, proposed to measure deformations near specified structures <br />or features or otherwise as appropriate for the operation. <br />(vi) Appropriate maps, prepared according to the standards of 2.10, showing the <br />underground workings, the location of any facilities or structures proposed for subsidence <br />control, and the location and extent of areas in which planned- subsidence mining methods <br />will be used including all areas where measures will be taken to prevent or minimize <br />subsidence and subsidence - related damage. <br />{vii) A schedule for the submittal of a detailed plan of the underground workings, as <br />required by Rule 4.20.1(3). <br />28 PN: 2013 -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.