My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-26_REPORT - C1982056 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2015-02-26_REPORT - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:45 PM
Creation date
2/26/2015 10:50:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
2/26/2015
Doc Name
Foidel Subsidence Evaluation Part 3(Final)
From
DRMS
To
Nicole Caveny
Type & Sequence
PR10
Permit Index Doc Type
Subsidence Report
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SubTerra, Inc. Peabody Twentymile Coal LLC 09/2712014 <br />Foidel Creek Mine <br />Permit Revision for Longwall Mining in the Wolf Creek Seam - Subsidence Evaluation <br />ATTACHMENT A <br />Section 2.05.6 (6) Subsidence Survey, Subsidence Monitoring, and Subsidence Control <br />Plan. <br />(a) For underground mining activities the application shall include an inventory of all structures and <br />renewable resource lands which exist within the proposed permit and adjacent area. <br />(i) If no such structures or renewable resource lands exist, no further information need be <br />provided in the application under this Section. <br />(ii) If such structures or renewable resource lands exist, the application shall include:. <br />(A) A brief description of all structures and renewable resource lands which exist <br />within the proposed permit and adjacent area; and <br />(B) An appropriate map, prepared according to Section 2.10, showing the location <br />and configuration of structures and renewable resource lands within the permit and <br />adjacent area. <br />(b) If structures and renewable resource lands are determined to exist within the proposed permit <br />and adjacent area, the application shall include a description of the worst possible consequences <br />which subsidence, if it occurred, could have for such structures and renewable resource lands. <br />(i) The application shall include a determination of whether subsidence, if it occurred, could <br />cause material damage or diminution of reasonably foreseeable use of such structures and <br />renewable resource lands. This description of worst possible subsidence consequences <br />shall include: <br />(A) A brief description of pre- and post mining land uses of the permit and adjacent <br />area, as described pursuant to Sections 2.04.3 and 2.05.5; <br />(B) A brief description of subsidence related phenomena predicted to occur within <br />the permit and adjacent area; and <br />(C) A brief description of material subsidence damage or diminution of reasonably <br />foreseeable use of structures and renewable resource lands which could result from <br />the occurrence of the subsidence related phenomena described in accordance with <br />Section 2.05.6(6)(b)(i)(B), including consideration of the definitions and <br />considerations contained in Sections 2.05.6(6)(e)(ii)(A),(B), and (C). <br />(ii) If the description of worst possible subsidence consequences, prepared in accordance <br />with Section 2.05.6(6)(b)(i), determines that no material damage or diminution of <br />reasonably foreseeable use could result in the event of mine subsidence within the permit <br />and adjacent areas, and if the Division concurs with that conclusion, the application shall <br />include a monitoring program designed to determine the accuracy of that conclusion, as <br />described in Section 2.05.6(6)(c). <br />(iii) If the description of worst possible subsidence consequences, prepared in accordance <br />with Section 2.05.6(6)(b)(i), determines that material damage or diminution of reasonably <br />foreseeable use could result in the event of mine subsidence within the permit and adjacent <br />areas, the application shall include additional information as required by either one of the <br />following: <br />(A) A subsidence survey, as described in Section 2.05.6(6)(e); or <br />(B) A subsidence control plan, as described in Section 2.05.6(6)(f). <br />24 PN: 2013 -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.