My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-24_REVISION - M1997065 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2015-02-24_REVISION - M1997065 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:28 PM
Creation date
2/25/2015 9:46:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
REVISION
Doc Date
2/24/2015
Doc Name
Application AM02
From
Stone Wholesale, Inc.
To
DRMS
Type & Sequence
AM2
Email Name
MAC
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BROWNSTONE 2015 STATE EXHIBIT — L <br />RECLAMATION COSTS <br />The amendment area to be excavated and reclaimed is 4.4 acres or 191,664 square feet. <br />The average depth or overburden to be removed is 8'. <br />The total volume of overburden is 56,789 cubic yards <br />The total volume of topsoil averaging 3" deep is about 2,839 cubic yards <br />The mining plan to be employed in this amendment area allows for an approximate area 75'X 75'X 15' <br />to be excavated at one time sequentially to the adjacent area of the same approximate size. About half, <br />or 28,000 cubic yards, of the overburden will be bailed into the adjacent void with a Hitachi 450 <br />Excavator as the mining process proceeds. The remaining overburden will be moved, by an off road <br />Volvo 6 wheel drive truck, to an area in the existing permitted area for stockpiling within 500 feet north <br />of the amendment area. The total of overburden to be completely removed and stockpiled is about <br />28,000 cubic yards. The total of topsoil to be completely removed and stockpiled is about 2,839 cubic <br />yards. The topsoil will be stripped and stockpiled using a front end loader as the 75'X 75'X 15' areas are <br />sequentially mined. Topsoil stockpiling will be located in the same vicinity as the overburden in a <br />separate pile, 500 feet north of the amendment area. <br />Current hydro- seeding prices for the 4.4 acres of disturbed land at $2840 per acre would be <br />approximately $12,493.65. <br />
The URL can be used to link to this page
Your browser does not support the video tag.