Laserfiche WebLink
Table L -2 Reclamation Task and Cost Estimate <br />Activity Description <br />Time <br />(Months) <br />Quantity <br />Unit Cost <br />($) <br />Cost ($) <br />Remove all diesel tanks, plants, and other <br />facilities including: <br />1 <br />$ <br />22,200 <br />Concrete foundation removal <br />960 CY <br />$ 20.00 <br />19,200 <br />Structure demolition <br />1,500 <br />Asphalt parking lot removal <br />10,000 SF <br />$ 10.00 <br />1,500 <br />Backfill and grade north platform area. <br />1,000,000 <br />CY <br />$ <br />2.00 <br />$ <br />2,000,000 <br />Topsoil appropriate areas to a depth of 12 <br />inches. <br />0.5 <br />135,695 <br />CY <br />$ <br />2.00,$ <br />271,390 <br />Broadcast seed all topsoiled areas including <br />vegetation islands. <br />0.5 <br />80 <br />acres <br />$ <br />700.00 <br />$ <br />56,000 <br />Mulch seeded areas excluding vegetation <br />islands. <br />0.5 <br />78 <br />acres <br />$ <br />500.00 <br />$ <br />38,955 <br />Wildlife fencing 4- strand barbed wire) <br />0.5 <br />7,824 <br />ft <br />$ <br />2.70 <br />$ <br />21,125 <br />Wildlife fencing (6' chain link) <br />8,150 ft <br />$ 13.65 <br />$ <br />111,248 <br />Totals <br />3.0 <br />$ <br />2,543,117 <br />DRMS Costs (28% x direct costs) <br />712,073 <br />Total Bond Amount <br />$ 3,077,171 LLI <br />Ralston Quarry, February 2015 L -4 <br />