My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-24_REVISION - M1974086 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974086
>
2015-02-24_REVISION - M1974086 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:40:49 PM
Creation date
2/25/2015 9:22:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
REVISION
Doc Date
2/24/2015
Doc Name
AM03 Response No. 1
From
Greg Lewicki and Associates, PLLC
To
DRMS
Type & Sequence
AM3
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COSTS <br />1W.462rr:10r1 <br />The maximum bond reclamation scenario will occur when the north platform above the Denver <br />Water tunnel is mined out. This area will require the largest amount of backfill. At this point in <br />time, Asphalt Paving Co. will have the 1.2 million cubic yards of material available to backfill <br />the north platform and construct the vegetation islands along the quarry slopes. Topsoiling will <br />involve the placement of screened topsoil on disturbed areas. Revegetation of disturbed areas <br />using the approved seed mixes will be completed once all backfilling, grading, and topsoiling is <br />done. Broadcast seeding or hydroseeding will be used, and mulch applied as well. <br />Backfill <br />Maximum bond volume of backfill needed 1,000,000 CY <br />Topsoil <br />North platform (12 inches over 10.5 acres) 16,940 CY <br />Processing area (12 inches over 67.4 acres) 108,755 CY <br />Vegetation islands 10,000 CY <br />Material available on site 1,200,000 CY <br />The permanent facilities that needed to be removed in the worst case scenario of this exhibit <br />include the asphalt parking lot and the facilities listed in Table L -1. All other equipment on site is <br />portable. <br />The backfill requirements for the bond calculation were determined using CAD software, the <br />volume report is attached. <br />Ralston Quarry, February 2015 L -1 <br />