My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-24_REVISION - M1974086 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974086
>
2015-02-24_REVISION - M1974086 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:40:49 PM
Creation date
2/25/2015 9:22:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
REVISION
Doc Date
2/24/2015
Doc Name
AM03 Response No. 1
From
Greg Lewicki and Associates, PLLC
To
DRMS
Type & Sequence
AM3
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />1. General Mining Plan <br />EXHIBIT D <br />The original application, and this amendment, proposes surface mining basalt for the production <br />of construction materials. This amendment proposes to change the post mine land use of the site <br />to a water storage reservoir. The total permit area will remain 271.61 acres. The total expected <br />mine life is 50+ years, with roughly 20 years of that remaining. The purpose of the mining <br />activity is to provide crushed rock, road base, asphalt, and related products for construction along <br />the Front Range. <br />The basalt dike that is being mined at the Ralston Quarry extends down at least 500 feet from the <br />original peak of the ridge (6500' elevation). Mining will continue to a final floor elevation of <br />6000'. The basalt likely continues deeper. The deposit is constrained by the shale contact along <br />the ridge line on the west side, and then extends out past the property line to the east. Mining will <br />be constrained by the shale contact and the property lines. <br />The amended permit boundary will encompass 271.61 acres containing all of the Asphalt Paving <br />Co. operations. The permit area is marked on site. Map C -3 shows the configuration of the fully <br />mined out quarry along with stormwater drainage patterns and the location of processing <br />equipment and stockpiles. The basalt is blasted in place into a series of slopes and benches on the <br />western side of the mining area. One continuous slope will be established on the east side. <br />Material is hauled from mining faces to the processing area via haul truck. Finished product that <br />is made in the processing area in the southwest of the permit area is sold and transferred off site. <br />Ralston Quarry produces crushed rock, road base, and asphalt. <br />Access to the mining area will be from the existing road connecting to Highway 93. <br />Traditional topsoil is not present on the site. The upper 2 -10 feet of material on undisturbed areas <br />contains a mixture of topsoil material and varying sizes of loose basalt. This material is stripped <br />and screened by Asphalt Paving Co. to sell the basalt, and the remaining non - basalt material will <br />be used as topsoil and fill. This process will generate approximately 50,000 CY of fill material a <br />year. This fill material is stored in stockpiles along the quarry edge and future mining areas in the <br />southeast corner of the permit. <br />Ralston Quarry, February 2015 D -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.