My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-02-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:41 PM
Creation date
2/25/2015 9:18:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/24/2015
Doc Name
Weekly Construction Quality Assurance Report
From
Cripple Creek & Victor Cold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and structural fill placement; SO and SF sampling; clearing and grubbing; underground working <br />remediation and confirmatory drilling; topsoil removal; HVSCS riser pipe installation; and monitoring <br />spent ore placement in the PSSA. <br />II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Spent Ore Samples SO 1 -1 and SO 7 -1 (information only). <br />Structural Fill Samples SF 120 -R through SF 123 -R. <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held February 11, 2015 (Amec Foster Wheeler, CC &V, <br />Ames) <br />Ames daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by: Bobby Redd, El <br />Reviewed by: y / <br />Tim Burkhar <br />Project Resident <br />Phone: 719 -689 -2986 <br />vi <br />Projects <br />Re <br />Reviewed By: �`- <br />Reviewed By: <br />Date: February 18, 2015 <br />Date: February 18, 2015 <br />Date: '2-/// 9//5 <br />Date: a I I -Lj- <br />_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.