My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-24_GENERAL DOCUMENTS - P2014022
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2014022
>
2015-02-24_GENERAL DOCUMENTS - P2014022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:41 PM
Creation date
2/25/2015 9:17:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014022
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/24/2015
Doc Name
Returned mail
From
USPS
To
Total E&P USA Oil Shale LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 02A <br />BULLDOZER WORK <br />Page 1 of 2 <br />Task description: Re -grade drilling pits <br />Permit Action: Reclamation Cost <br />Site: Preas Exploration Project Estimate Permit/Job #: P2014022 <br />PROJECT IDENTIFICATION <br />Task #: 02A <br />Date: 1/29/2015 <br />User: THM <br />State: Colorado <br />County: Rio Blanco <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D7R DS XR Series II <br />Horsepower: <br />238 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />I per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: P022 -02a <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$164.12 <br />$164.12 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />Utilization % <br />Ownership Cost/Hour: <br />$46.88 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$79.23 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$164.12 <br />$164.12 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />1,021 <br />Swell factor: <br />1.000 <br />Loose volume: <br />1,021 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,022.9 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,050 feet <br />2,550 lbs/LCY <br />Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.100 <br />(CAT HB <br />Dozing method: 1.000 <br />(GEN. <br />Visibility: 1.000 <br />(AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.