My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-24_GENERAL DOCUMENTS - P2014022
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2014022
>
2015-02-24_GENERAL DOCUMENTS - P2014022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:41 PM
Creation date
2/25/2015 9:17:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014022
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/24/2015
Doc Name
Returned mail
From
USPS
To
Total E&P USA Oil Shale LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclamation Cost Estimate <br />Site: Preas Exploration Project <br />PROJECT IDENTIFICATION <br />Permit Action: Reclamation <br />Cost Estimate <br />Task #: 001 State: Colorado <br />Date: 1/29/2015 County: Rio Blanco <br />User: THM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: P2014022 <br />Abbreviation: None <br />Filename: P022 -001 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />01 a <br />02a <br />03a <br />04a <br />Borehole P &A <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />40.00 <br />$29,049.60 <br />$332.00 <br />$9,065.00 <br />$1,957.00 <br />Re grade drilling its <br />DOZER <br />2.02 <br />Reve etate 2.41 acres disturbance <br />REVEGE <br />24.00 <br />Mobilization <br />MOBILIZTt <br />3.77 <br />SUBTOTALS: <br />69.79 <br />$40,404 <br />)INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />34.90 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contractibid preparation: 0.00% <br />Reclamation management and/or administration: 5.00% $2,415.38 <br />CONTINGENCY: 3.00 Total = $1,212.12 <br />TOTAL INDIRECT COST = $12,031.01 <br />TOTAL BOND AMOUNT (direct + indirect) = $52,435.01 <br />$816.16 <br />$424.24 <br />$2,622.71 <br />$4,040.40 <br />$7,903.51 <br />$48,307.51 <br />Total = 500.00 <br />Total = $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.