Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 04A Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />RANGELY <br />Total one -way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />45.00 mph <br />Total Non - Roadable Mob/Demob Cost <br />NA <br />`* two round trips with haul rig: <br />$1,934.79 <br />Total Roadable Mob/Demob Cost ** <br />0.89 <br />* * one round trip, no haul rig: <br />$22.66 <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIIVIE AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.44 <br />0.44 <br />0.44 <br />0.44 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.89 <br />0.89 <br />Total job time: 3.78 Hours <br />Total job cost: $1,957 <br />CIRCES Cost Estimating Software <br />