includes a visual assessment of the concrete. Should the concrete begin showing signs of failure <br />it will be repaired or replaced ". The Division will require a minimum quarterly inspection of the <br />underdrain ponds, except when water is stored in either one or both ponds, inspections shall be <br />monthly. Any problem shall be reported to the Division within 72 hours of the inspection. A <br />summary of the inspections shall be submitted to the division on an annual basis. The Division <br />suggests the annual underdrain report be submitted either with the annual Leak Detection System <br />Data report or the 112d -3 Annual Report. Please provide a written commitment to the proposed <br />monitoring program and annual report, including which annual report CC &V prefers to amend <br />with the underdrain ponds inspection report. <br />CC &V has formally implemented inspections that meet the Divisions requirements for <br />monthly /quarterly inspection of the underdrain pond concrete. Summary documentation of these <br />inspections will be provided in the 112d -3 Annual Report. At such time as the underdrain pump <br />back system designs are finalized, CC &V will discuss with the Division, the system and the need <br />for these inspections moving forward. <br />Please contact me at 719 - 689 -4055 should you have questions. <br />Sincerely, <br />dvCV-1"V4- <br />Timm Comer <br />Environmental Manager <br />