Laserfiche WebLink
ADMINSTRATION PROTOCOL <br />Augmentation Plan Exchanges <br />Division One — South' Platte River <br />Many of the plans for augmentation operating along the South Platte River include <br />recharge operations where fully consumable water is placed__in recharge sites and then <br />timed back to the river. Some plans include decreed exchanges whereby excess return <br />flows m'ay'be exchanged back up to a headgate or well and �e- diverted. This document <br />provides the protocol water user's must follow in order to operate the 'exchange. This <br />on the South Platte River, however, is specifically designed to address both-decreed and <br />water commissioner approved exchanges associated with plans for augmentation. This <br />protocol is subordinate to any decreed language addressing specific exchange <br />operations. <br />River condition below the exchange: No Call or Free River <br />No exchange may operate unless: <br />F1. The water commissioner has been given at least 48 hours and not more than 7 <br />days advance notice of the intent to operate the exchange. <br />F2. The water commissioner determines there is sufficient exchange potential to <br />operate the exchange. <br />F3. The water commissioner has current accounting and is able to verify that there <br />are excess return flows reporting to the river. <br />River condition below the exchange: Storage Call <br />In addition to the requirements in F1 thru F3, above, no exchange may operate unless: <br />S1.The water commissioner determines that the exchange can be operated without <br />injuring water rights that are senior to the exchange. <br />S2. The storage - season -to -date' (November 1 to the day the return flows report to <br />the river) net impact of the augmentation plan operation on the river is not <br />negative; or, in the opinion of the water commissioner, there is a reasonable <br />expectation the impact will be non - negative by the start of the irrigation season <br />(typically, April 1). <br />S3. The timing of the exchange is limited to the day the excess return flow reports to <br />the river unless the water commissioner agrees that return flows can be <br />consolidated such that a larger diversion over a shorter period of time is made <br />without injuring the calling or other senior water rights. If an aggregated <br />diversion is allowed, the volume of the aggregated diversion cannot exceed the <br />volume of excess return flow reporting to the river during the month the exchange <br />takes place; i.e. excess return flow credits may not be carried over from one <br />month to the next. <br />Administration Protocol - Augmentation Plan Exchanges <br />Revised December l,'2007 <br />