Laserfiche WebLink
//C C- M C- x <br />February 19, 2015 <br />Mr. Michael Cunningham Via FEDEX <br />Environmental Protection Specialist TRK 7729 4298 8090 <br />Td Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: CEMEX Lyons Mine Permit M- 1977 -208 / n <br />Technical Revision No.12, Revised Groundwater Monitoring Plan v <br />Fourth Quarter 2014 Monitoring Data DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Dear Mr. Cunningham: <br />This letter transmits surface water and groundwater data associated with the sampling of cement kiln dust disposal <br />area (C -Pit). The report includes data from the C -Pit ponded water and related groundwater monitoring for the fourth <br />quarter of 2014, covering the reporting period October 1, 2014 to December 31, 2014. Table 1 presents data for the last <br />four quarters. <br />For the fourth quarter compliance monitoring, water samples were collected on December 9, 2014 from CEM -oo1 and <br />CEM -o04 groundwater monitoring wells, and from the C -Pit ponded water. Inspections of well CEM -o05 indicated that <br />the well did not produce any water. <br />The samples collected from C -Pit ponded water and groundwater wells were analyzed for pH, chloride, sulfate, total <br />dissolved solids, selenium, and thallium. The reported pH data is based on the pH analysis performed at the time of <br />collection (Table 1). In addition, a Stiff Diagram of the groundwater cation /anion data from CEM -o04 compared to go% <br />of the average cation/anion concentration in C -Pit is provided in Figure 1 for reference. <br />Calcium <br />Magnesium <br />Potassium <br />Sodium <br />h� <br />� R0 6C <br />L.".d <br />_ <br />C -Pit Average <br />C- Pi190% Average <br />® <br />12109/2014 CEM 004 <br />Bicarbonate <br />(as CaCO3) <br />Carbonate <br />Chloride <br />Sulfate <br />40 20 0 20 40 60 00 mOOlL <br />CEM 004 <br />12109/2014 <br />Figure 1: Fourth quarter cation/anion data for CEM -o04 compared to the <br />TR -12 C -Pit Monitoring and Trigger Parameters. <br />