My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-17_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2015-02-17_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:30 PM
Creation date
2/20/2015 9:56:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
2/17/2015
Doc Name
Adequacy Review Memo - Reclamation Plan
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
TR20
Email Name
MLT
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />February 17, 2015 <br />To: Marcia Talvitie <br />From: Susan Burgmaier " <br />Re: King Mines (Permit No. C- 1981 -035) <br />Technical Revision No. 20 (TR -20) <br />Per Dan Hernandez's request, I have reviewed the reclamation costs associated with the technical <br />revision application (TR -20) submitted by GCC Energy, LLC (GCC). GCC is proposing to construct a <br />coal mine waste bank at the King I Mine portal bench. <br />The most recent reclamation cost estimate includes most of the tasks associated with reclamation <br />of the proposed waste bank. The waste bank will be constructed within the existing disturbed <br />area, so costs for revegetation had already been included in the reclamation cost estimate for the <br />entire site. Reclamation of the waste bank will, however, require placement of cover material over <br />the refuse material. There are also requirements, in the Trautner Geotech, LLC report, for <br />rehandling of existing refuse material but there is no estimate of the amount of material requiring <br />replacement. To accurately estimate the reclamation costs associated with the proposed waste <br />bank, the Division will need additional information. Please forward these comments to GCC: <br />1. The Trautner Geotech, LLC report, in Appendix C, indicates that the waste bank will be covered <br />with 6 -8" of cover material (rototilled into the waste) and 24" of suitable plant growth medium. <br />Please provide the origin of the clay material and the plant growth medium so that the <br />Division can estimate the costs to haul and place this material on the waste bank. <br />2. If the cover material for the waste bank will be borrowed from elsewhere on site, please <br />provide a reclamation plan for the borrow area as well as a drainage and sediment control <br />plan to be implemented during excavation and reclamation of the borrow area. <br />3. The Trautner Geotech, LLC report detailing construction of the waste bank indicates that <br />existing refuse material on the bench will need to be removed and placed in accordance with the <br />construction recommendations in the report (12 -24" lifts compacted to 90% of maximum dry <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />©F cow <br />I *` *, <br />1976 4L <br />
The URL can be used to link to this page
Your browser does not support the video tag.