Laserfiche WebLink
Louis Head <br />Page 2 <br />November 21, 2014 <br />7. Item resolved - NECC revised Exhibit 19(25) and Map 13 to account for the revised <br />surface water handling between the 4 -way intersection and pond 7. <br />Rule 2.05.3(4) Operation Plan — Permit Area — Coal Processing Waste and Non -Coal Processing Waste <br />8. Item resolved —NECC revised page 2.05 -43 to address the material properties of <br />development waste being deposited on the RDA <br />Rule 3.02.2 - Determination of Bond Amount <br />9. Item resolved - Exhibit 28 (Reclamation Cost Estimate) already contains tasks for the <br />removal of a belt and belt feeder that were permitted with MR101, and for the removal of <br />culvert C19. The redesignation of the RDA access road as a haul road does not affect the <br />reclamation liability. <br />Pagination <br />10. TR68 was issued on February 13, 2015. This revision reformatted large sections of the <br />permit text, and has led to some issues with pagination. The majority of these issues will be <br />addressed in the review of the RN6 application, which is now in progress. <br />In the meantime, the revised pages submitted with the TR70 application should be numbered <br />in accordance with TR68 text. <br />(I have attempted to summarize below where the relevant pages are to be found in the newly <br />approved text) <br />Revised pages in TR70 application <br />Corresponding pages in recently approved <br />permit text <br />2.05 -5, 6a <br />Section 2.05, pages 11 -13 <br />2.05 -7a, 7b, 7c, 7d <br />Section 2.05, pages 14 -18 <br />2.05 -11; 2.05 -14, 14a <br />Section 2.05 pages 23 -29 <br />2.05 -43 <br />Section 2.05, pages 47 -48 <br />The proposed decision due date for TR70 is February 27, 2015. <br />Please feel free to contact me with any questions or comments. <br />Yours sincerely, <br />Leigh Simmons <br />Environmental Protection Specialist <br />CC. Ron Thompson, John Terry <br />