My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-18_GENERAL DOCUMENTS - M2014068
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2014068
>
2015-02-18_GENERAL DOCUMENTS - M2014068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:31 PM
Creation date
2/19/2015 8:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014068
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/18/2015
Doc Name
Adequacy Letter Response
From
City of Holyoke
To
DRMS
Email Name
ERR
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fe0m <br />9711e_� a1'It, y 0-1c, /4)6�04e_ <br />February 12, 2015 <br />Elliott Russell `D <br />Re: Arthur -Mae Gravel Pit, Permit No. M- 2014 -068, Construction Materials Reclamation Permit <br />Applications, Adequacy Letter Response <br />Dear Mr. Russell, <br />Please find the enclosed corrections and additions adequate to the rules. <br />In regards to statements 1 and 2 of the adequacy letter, I mailed the certified mail receipts and proof of <br />publication to the division on January 30, 2015. <br />6.3.3 Exhibit C — Mining Plan <br />In compliance with the rule 6.3.3(d), the thickness of the deposit to be mined is believed to be between <br />1 ft. and 5ft. <br />In compliance with rule 6.3.3(p), explosives will not be used in the mining or reclamation process. <br />The entrance coordinates for the "secondary" access off of County Road 47 is, N: deg 40 -min 34 -sec <br />39.95 and W: deg 102 -min 14 -sec 40.02. This entrance will be a driveway off of County Road 47 on to a <br />haul way to the mining area. If needed, the access road between the two mining areas will be a 20 ft. <br />passage way. <br />6.3.4 Exhibit D — Reclamation Plan <br />In the process of reclaiming the creek bed, the bottom of the creek will be graded as level as possible for <br />the flow of water through the site. <br />As part of the reclamation plan, by just cleaning the bottom of the creek bed, of loose gravel, <br />disturbances of the creek banks will be to a minimum. With the use of implementing slopes, dirt berms <br />and re- seeding, long -term erosion control should be sustained. <br />6.3.12 Exhibit L— Permanent Man -Made Structures <br />Included with this letter, please find the first page of the structure agreement between Mike Roll and <br />the City of Holyoke. Existing fences within the permit area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.