Laserfiche WebLink
King Mines C1981035 Midterm Review No_ 7 Page 10 of 123 <br />TRUCK/LOADER TEAM WORK <br />Task description: King I - haul topsoil /growth medium to Upper Facilities Area <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 938H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C035 -004 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $248.95 <br />MATERIAL OUANTITIES <br />Initial volume: 1,581 CCY Swell factor: 1.165 <br />Loose volume: 1,842 LCY <br />Source of estimated volume: 1.96 acres x 6" depth <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 <br />$21.63 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.40 <br />$38.09 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$37.13 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 <br />$96.85 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $248.95 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $248.95 <br />MATERIAL OUANTITIES <br />Initial volume: 1,581 CCY Swell factor: 1.165 <br />Loose volume: 1,842 LCY <br />Source of estimated volume: 1.96 acres x 6" depth <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: <br />2,850 <br />Description: <br />User Provided <br />Rated Payload: <br />35,400 <br />Payload Capacity: <br />12.42 <br />Truck Bed (volume) Basis: <br />Pounds /LCY <br />Pounds <br />LCY <br />