My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-18_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2015-02-18_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:32 PM
Creation date
2/18/2015 2:40:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
2/18/2015
Doc Name
Midterm Review Findings Document
From
DRMS
To
GCC Energy, LLC
Type & Sequence
MT7
Email Name
MLT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No_ 7 Page 6 of 123 <br />BULLDOZER RIPPING WORK <br />Task description: King I - Rip 12" in upper facility area <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 2/11/2015 <br />User: SLB <br />ieismic: <br />Area: <br />State: Colorado <br />County: La Plata <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Ripper Attachment: 3 -Shank Ripper <br />DRMS <br />Abbreviation: None <br />Filename: C035 -002 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />NA <br />feet/second <br />Area: <br />7,400 <br />feet <br />Utilization % <br />Ownership Cost/flour: <br />$69.05 <br />Average Ripping Width: <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />300.00 <br />100 <br />Ripper Operating Cost/Hour: <br />$7.46 <br />feet <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />Production per unit area: <br />NA <br />Total Unit Cost/Hour: <br />$222.73 <br />Total Fleet Cost/flour: <br />$222.73 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods <br />NA Bank Volume: NA BCY NA <br />1.96 acres Rip Depth (ft): <br />Source of estimated quantity: <br />HOURLY PRODUCTION <br />Seismic: <br />1.00 <br />I -007 <br />Volume: 3,162 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />7,400 <br />feet <br />Average Ripping Depth: <br />1.00 <br />mph <br />Average Ripping Width: <br />7.08 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.800 <br />acres /hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.800 <br />Acres /hr <br />Site Altitude: <br />7,400 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift /day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.66 <br />Acres /hr <br />Adjusted Hourly Fleet Production: <br />0.66 <br />Acres /hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: 2.95 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.