Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Summary of Costs for King I and King II Mines <br />Site: King Coal Mine Permit Action: Midterm Review No_ 7 Permit/Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 000 State <br />Date: 2/11/2015 County <br />User: SLB <br />Colorado <br />La Plata <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C035 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />032 <br />050 <br />051 <br />052 <br />060 <br />062 <br />064 <br />065 <br />100 <br />200 <br />300 <br />Demolish King I Structures <br />DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />40.00 <br />$57,412.16 <br />$658.00 <br />$3,625.00 <br />$1,122.00 <br />$177.00 <br />$1,811.00 <br />$795.00 <br />$331.00 <br />$1,211.00 <br />$109.00 <br />$1,100.00 <br />$1,745.00 <br />$249.00 <br />$536.00 <br />$8,400.00 <br />$2,159.00 <br />$755.00 <br />$96.00 <br />$998.00 <br />$181.00 <br />$1,848.00 <br />$1,425.65 <br />$2,238.00 <br />$4,245.98 <br />$1,719.00 <br />$4,258.80 <br />$10,051.00 <br />$5,148.00 <br />$2,780.00 <br />$4,258.80 <br />$3,142.00 <br />$5,177.00 <br />$26,060.00 <br />$66,783.20 <br />$263,763.28 <br />$321.00 <br />King I - Rip 12" in upper facility area <br />RIPPER <br />2.95 <br />King I - push ripped waste to tipple highwall <br />DOZER <br />16.28 <br />King I - haul topsoil/growth medium to Upper <br />Facilities Area <br />TRUCKI <br />4.51 <br />King I - Finish grade upper facilities area <br />GRADER <br />1.81 <br />King I - Revegetate upper facilities area (area #3) <br />REVEGE <br />4.00 <br />King I - Haul topsoil/growth medium to highwall <br />TRUCKI <br />3.19 <br />King I - backfill portals, grade fill slope and topsoil <br />DOZER <br />1.54 <br />King I - revegetate highwall area (Area #4) <br />REVEGE <br />4.00 <br />King I - rip and final grade lower facilities area <br />GRADER <br />1.09 <br />King I - revegetate highwall area (Area #4) <br />REVEGE <br />4.00 <br />King I - regrade cover of pre -law portion of refuse <br />area <br />DOZER <br />8.11 <br />King I - regrade 6" growth medium on pre -law <br />refuse area <br />DOZER <br />1.16 <br />King I - revegetate refuse area (Area #5) <br />REVEGE <br />2.00 <br />King I - Push 3.5' cover to refuse pile <br />DOZER <br />39.02 <br />Kin I - grade 3.5' cover on post-law refuse area <br />DOZER <br />10.03 <br />King I - Haul topsoil to post -law refuse area <br />TRUCKI <br />3.03 <br />King I - finish grade post -law refuse area (area #6) <br />GRADER <br />0.97 <br />King I - revegetate refuse area (Area #6) <br />REVEGE <br />2.00 <br />King I - finish grade topsoil area <br />GRADER <br />1.84 <br />King I - revegetate borrow area <br />REVEGE <br />4.00 <br />King I - seal vent hole <br />BOREHOLE <br />8.00 <br />King I - backfill and regrade east and west <br />sediment ponds <br />DOZER <br />10.40 <br />Install Rip Rap in Drainages <br />NA <br />18.95 <br />King I - revegetate east and west ponds (Area #6) <br />REVEGE <br />4.00 <br />King I -Rill and gully maint. 8 hours every other <br />yr, 10 yrs <br />SITEMAINT <br />ENANCE <br />24.00 <br />King I &II - mobilize for initial reclamation <br />MOBILIZE <br />8.00 <br />King I &II - mobilize for rill and gully <br />maintenance, X 3 <br />MOBILIZE <br />8.00 <br />King I &II - mobilize for second pond cleaning <br />MOBILIZE <br />8.00 <br />King II -Rill and gully maint. 8 hours every other <br />yr, 10 yrs <br />SITEMAINT <br />ENANCE <br />24.00 <br />Weed Control over liability period <br />REVEGE <br />35.00 <br />Clean sediment ponds (two cleanings) <br />EXCAVATE <br />65.13 <br />King 11 - haul sediment from ponds to King I site <br />TRUCKI <br />30.85 <br />Seal Mine Openings <br />MINESEAL <br />32.00 <br />King 11 structural demolition <br />DEMOLISH <br />140.00 <br />King 11 - Haul coal waste rock to King I waste pile <br />TRUCKI <br />1.06 <br />