Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Push Temporary Coal Stockpiles to Conveyor <br />Site: New Elk Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 606 State: Colorado <br />Date: 5/12/2014 County: Las Animas <br />User: JRS <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat 139T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C012 -606 <br />Total unit Cost/Hour: $253.73 <br />Total Fleet Cost/Hour: $761.20 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,250 <br />Swell factor: 1.000 <br />Loose volume: 13,250 LCY <br />Source of estimated volume: PAP 2.05 -4a Table 18a. Push to convevor <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />400 feet <br />305.6 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 0% <br />Average site altitude: 7,000 feet <br />Material weight: 1,600 Ibs/LCY <br />Weight description: Coal - Bituminous, Raw <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$72.57 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $253.73 <br />Total Fleet Cost/Hour: $761.20 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,250 <br />Swell factor: 1.000 <br />Loose volume: 13,250 LCY <br />Source of estimated volume: PAP 2.05 -4a Table 18a. Push to convevor <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />400 feet <br />305.6 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: 0% <br />Average site altitude: 7,000 feet <br />Material weight: 1,600 Ibs/LCY <br />Weight description: Coal - Bituminous, Raw <br />CIRCES Cost Estimating Software <br />