Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 680 Page 3 of 3 <br />Haul Route! <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />3000.00 <br />4.00 <br />3.00 <br />7.00 <br />1568 <br />1.946 <br />Haul Time: 1.946 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />3000.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />1.064 <br />Loading Tool unit <br />Production 551.07 <br />Truck Unit Production <br />114.90 <br />Optimal No. of Trucks: 5 <br />Return Time: 1.064 <br />Total Truck Cycle Time: 4.940 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 286.10 <br />Adjusted single truck/loader team production: 286.10 <br />Adjusted multiple truck/loader team production: 286.10 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $3.493 /LCY <br />minutes <br />minutes <br />7.39 LCY/Hour <br />.37 LCY/Hour <br />3 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />Total job time: 1.40 Hours <br />Total job cost: $1,397 <br />CIRCES Cost Estimating Software <br />