Laserfiche WebLink
Scraper Worksheet Cont'd Task # 669 Page 1 of 2 <br />Task description: <br />Site: New Elk Mine <br />SCRAPER TEAM WORK <br />Replace Topsoil to Raw Coal Storage Stockpile <br />Permit Action: Permit Renewal 06 Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 669 State: Colorado <br />Date: 11/4/2014 County: Las Animas <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 627G <br />- Dozer: Cat D9T - 9SU <br />Abbreviation: None <br />Filename: C012 -669 <br />COSTShift basis: lamer day <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />f'...t 12 u UA­• CrrnnPr Wnrk Team <br />Cimnnrt Fnrninment Maintenance F.auinment <br />Total work team cost/hour: $1.011.73 <br />MATERIAL QUANTITIES <br />Initial volume: 1,060 CCY Swell factor: 1.000 <br />Loose volume: 1,060 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Estimate <br />HOURLY PRODUCTION <br />Material weight: 2,055 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 25.69 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$69.99 <br />$81.10 <br />NA <br />NA <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$184.31 <br />$143.16 <br />NA <br />NA <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />$38.01 <br />NA <br />NA <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$287.87 <br />$262.26 <br />NA <br />NA <br />$101.43 <br />$72.30 <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$838.00 <br />Support: <br />$0.00 <br />Maint: <br />$173.73 <br />Total work team cost/hour: $1.011.73 <br />MATERIAL QUANTITIES <br />Initial volume: 1,060 CCY Swell factor: 1.000 <br />Loose volume: 1,060 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Estimate <br />HOURLY PRODUCTION <br />Material weight: 2,055 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 25.69 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />