My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-26_PERMIT FILE - C1981012A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2015-01-26_PERMIT FILE - C1981012A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 10:05:25 AM
Creation date
2/18/2015 10:38:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
1/26/2015
Doc Name
Bond Calculations (RN5, TR50 & TR51)
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPACTION WORK <br />Task description: Compact Final RDA Surface <br />Site: New Elk Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 615 State: Colorado <br />Date: 5/12/2014 County: Las Animas <br />User: JRS <br />Abbreviation: None <br />Filename: C012 -615 <br />Agency or organization name: DRMS <br />Unadjusted hourly production = (W x S x L x Q/ P <br />Compacted width per pass (W): <br />HOURLY EQUIPMENT COST <br />Average Compactor Speed (S): <br />4.00 mph <br />Basic Machine: CAT 815F <br />8.00 inches <br />Horsepower: 240 <br />Compactor Type: Soil - tamping foot <br />Required number of machine passes (P): <br />Shift Basis: 1 per day <br />Unadjusted Hourly Unit Production: <br />847.60 CCY/hour <br />Data Source: (CRG) <br />Cost Breakdown: <br />Source <br />Altitude Adj: 1.00 <br />CAT HB <br />Utilization % <br />Ownership Cost/Hour: <br />$36.81 <br />NA <br />Operating Cost/Hour: <br />$82.25 <br />100 <br />Operator Cost/Hour: <br />$28.75 <br />NA <br />Total Unit Cost/Hour: <br />$147.81 <br />Total Fleet Cost/Hour: <br />$147.81 <br />Unit cost: $0.210 per CCY <br />MATERIAL OUANTITIES <br />Loose volume: 26,250 LCY <br />Compacted volume: 22,838 CCY <br />Source of estimated volume: 8.13 acre RDA surface X 2 ft. lift <br />Source of estimated shrinkage factor: Cat Handbook <br />Shrinkage factor: 0.870 <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x Q/ P <br />Compacted width per pass (W): <br />6.50 feet <br />Average Compactor Speed (S): <br />4.00 mph <br />Compacted thickness of each lift (L): <br />8.00 inches <br />Conversion Constant (C): <br />16.3 (5,280ft. /12in. /27cu.ft.) <br />Required number of machine passes (P): <br />4 passes <br />Unadjusted Hourly Unit Production: <br />847.60 CCY/hour <br />Job Condition Correction Factors <br />Site Altitude: 7,500 feet <br />Source <br />Altitude Adj: 1.00 <br />CAT HB <br />Job Efficiency: 0.83 <br />1 shift/day) <br />Net Correction: 0.8300 <br />multiplier <br />Adjusted Hourly Unit Production: <br />703.51 CCY /Hour <br />Adjusted Hourly Fleet Production: <br />703.51 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Total job time: 32.46 Hours <br />Unit cost: $0.210 per CCY <br />Total job cost: $4,798.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.