Laserfiche WebLink
• <br />• <br />SEDCAD 4.0 <br />Reclamation Ditch Design Though Reclaimed B -Seam <br />Portal <br />Material: Riprag <br />Trapezoidal Channel <br />Bottom Left Right <br />Freeboard Freeboard Freeboard <br />Width (ft) Sideslope Sideslope Slope ( %) <br />e� - - Mult x <br />Ratio Ratio <br />of <br />Depth (ft) Depth (VxD) <br />4.00 1.5:1 1.5:1 35.0 <br />1.00 <br />Simons /OSM Method - Steep Slope Design <br />Velocity and Manning's n calculations may not apply for this method. <br />This design is for a post mining drainage channel that will be constructed in the ephemeral <br />channel after the B -Seam portal area is restored to approximate original contour. See Map 18 <br />Post Mining Contours. Two flow values were considered for the channel design. The first was <br />the flow rate for ditch B -6 (2.63 cfs) and the second was the 10 -year flow event for Pond B <br />(17.05 cfs). There was very little difference in the required channel configuration because of <br />the steep slope design method. Therefore, the channel will be designed using the ultra <br />conservative 17.05 cfs flow. The results are shown above. <br />The calculations and inf4 i�%�t+ge1 pfes�e►i this page were prepared by me during the <br />month of April 2002, ani40formation��if2s�ited is true and correct to the best of my <br />knowledge and belief. *pl 1�;?3 i <br />P4 -a <br />SEDCAD Utility Run <br />PR -07 A PPPOVCb <br />5/t1 jai <br />le lis RVXstnal Engineer <br />State of Colorado No. 19230 <br />Exh8 - 190 - <br />Printed 04 -21 -2003 <br />4/03 <br />w/o Freeboard w/ Freeboard <br />Design Discharge: <br />17.05 cis <br />Depth: <br />0.14 It 1.14 ft <br />Top Width: <br />4.43 ft 7.43 ft <br />Velocity*: <br />X- Section Area: <br />0.61 sq ft <br />Hydraulic Radius: <br />0.135 <br />Froude Number*: <br />Manning's n *: <br />Dmin: <br />6.00 in <br />D50: <br />18.00 in <br />Dmax: <br />22.50 in <br />Velocity and Manning's n calculations may not apply for this method. <br />This design is for a post mining drainage channel that will be constructed in the ephemeral <br />channel after the B -Seam portal area is restored to approximate original contour. See Map 18 <br />Post Mining Contours. Two flow values were considered for the channel design. The first was <br />the flow rate for ditch B -6 (2.63 cfs) and the second was the 10 -year flow event for Pond B <br />(17.05 cfs). There was very little difference in the required channel configuration because of <br />the steep slope design method. Therefore, the channel will be designed using the ultra <br />conservative 17.05 cfs flow. The results are shown above. <br />The calculations and inf4 i�%�t+ge1 pfes�e►i this page were prepared by me during the <br />month of April 2002, ani40formation��if2s�ited is true and correct to the best of my <br />knowledge and belief. *pl 1�;?3 i <br />P4 -a <br />SEDCAD Utility Run <br />PR -07 A PPPOVCb <br />5/t1 jai <br />le lis RVXstnal Engineer <br />State of Colorado No. 19230 <br />Exh8 - 190 - <br />Printed 04 -21 -2003 <br />4/03 <br />