Laserfiche WebLink
STORMWATER ANNUAL REPORT <br />- METAL MINING (& COAL) <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD -P -B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />Make enough copies of form for each reporting year. Or go to <br />http: / /www.cdphe. state. co. us/ wq/ PermitsUnit lstormwaterlindustriaLhtmi <br />Permittee (Company Name): 12 I-k/6 /ll f 'tr' r, 4 <br />Facility Name: <br />J <br />Mailing Address: ! (1 t Iry �• 2 <br />/!/ <br />Facility Phone Number: ( 1 <br />Permit Certification No. COR -04 D 62 (DO NOT USE 0000) <br />RECEIVED <br />JAN 15 2015 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />l <br />Check if this is a <br />new name, address, etc. <br />Reporting Period: Jan. 1 -Dec. 31, 20 / ,-I (Form is due by Feb. 15 of the following year) <br />* *Each section must be completed. Please print or type. ** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements <br />made in any of your Best Management Practices (BMPs), employee training, spills, other problems <br />encountered, etc. How is your plan working ?) <br />Were changes made to your SWMP? `N-o _ Yes - Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, findings, and action <br />taken. (The permit requires at least two comprehensive facility inspections per year - see page 12 of the permit. <br />Include here a summary of those inspections, plus any other comprehensive inspections made. It is not <br />necessary to summarize day -to -day inspections, unless significant problems were noted.) <br />First Inspection - Date L / -.Z_1& Findings, and action taken: <br />Note - form may be reproduced <br />Page 1 of 2 <br />r <br />- " Z -- 61ti - 11 /0 -/Z / Z_ <br />ar6ftmm <br />