Laserfiche WebLink
PETERS PIT <br />RECLAMATION PLAN <br />Pit depth 15 -20 ft <br />The topsoil will be removed by a dozer and loader with 12 -40 inches <br />of overburden & topsoil moved as needed from West to East. When f <br />reclaiming the old pit, the stockpile will be removed as needed out of <br />the working area. In the middle of the pit, gravel will be pushed in a <br />pile with a Loader and then loaded on trucks. <br />ESTIMATED COST FOR RECLAMATION <br />Dozer 200 hours x$160.00= 32,000.00 <br />.. Loader 200 hours x $100.00 = 20,000.00 <br />Grader 170 hours x 585.00= 14,450.017 <br />Tillage & planting 500.00 <br />Seed $59.00 acre x 11.8 = 696.00 <br />Man his 50 hours z $15.00 = 750.00 <br />GRANDTOTAL 68,396.00 <br />11 A ` <br />lbON41 b OSIVALD <br />/— /9- o?D // <br />t <br />RECEIVED <br />JAN 2 f 2015 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />A- /171- 07� <br />A i SCA Ie <br />t 'WORK �,'�ZEcT7oIJ <br />Q <br />EXHIBIT C <br />�u <br />y <br />' -P L J'h i <br />__ --- <br />P14S71i RF4. r9 nl D <br />I <br />_ _.. i-. <br />j � -ET F��snfi` <br />T. <br />r.} I <br />I <br />' -P L J'h i <br />__ --- <br />P14S71i RF4. r9 nl D <br />I <br />_ _.. i-. <br />j � -ET F��snfi` <br />T. <br />r.} I <br />I <br />