Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 009 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />LONGMONT <br />Total one -way travel distance: <br />8.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Nbn- Roadable Mob /Demob Cost * <br />NA <br />`* two round trips with haul rig: <br />$8,672.73 <br />Total Roadable Mob/Demob Cost ** <br />$11.82 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.20 <br />0.20 <br />0.20 <br />0.20 <br />2.00 <br />NA <br />2.00 <br />NA <br />4.40 <br />0.40 <br />Total job time: <br />8.80 Hours <br />Total job cost: $8,685 <br />CIRCES Cost Estimating Software <br />