My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-06_REVISION - M2005059 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005059
>
2015-02-06_REVISION - M2005059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:19 PM
Creation date
2/11/2015 8:52:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005059
IBM Index Class Name
REVISION
Doc Date
2/6/2015
Doc Name
FW Increase, S101
From
DRMS
To
Asphalt Specialties Co., Inc.
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 004 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Rip /condition liner material from pit floor <br />Site: Nelson Mining Resource Permit Action: Reclamation Permit/Job #: M2005059 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 1/27/2015 County: Weld <br />User: ECS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M059 -004 <br />Total unit Cost/Hour: $225.71 <br />Total Fleet Cost/Hour: $451.43 <br />MATERIAL QUANTITIES <br />(AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$70.00 <br />NA <br />Operating Cost/Hour: <br />$107.59 <br />100 <br />Ripper op. Cost/Hour: <br />$9.28 <br />100 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total unit Cost/Hour: $225.71 <br />Total Fleet Cost/Hour: $451.43 <br />MATERIAL QUANTITIES <br />(AVG.) <br />Initial Volume: <br />156,000 <br />Swell factor: <br />1.000 <br />Loose volume: <br />156,000 LCY <br />Source of estimated volume: Operator <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />634.3 LCY/hr <br />Materials consistency description: Rock, avg. ripped or blasted 0.7 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />4,800 feet <br />00 lbs/LCY <br />Wefight description: Decomposed rock - 75% Rock, 25% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />0.750 <br />(AVG.) <br />0.700 <br />(CAT HB) <br />1.000 <br />GEN.) <br />1.000 <br />AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />
The URL can be used to link to this page
Your browser does not support the video tag.