Laserfiche WebLink
Scraper Worksheet Cont'd Task # 007 Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil <br />Site: Nelson Mining Resource Permit Action: Reclamation Permit/Job #: M2005059 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 1/27/2015 County: Weld Filename: M059 -007 <br />User: ECS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br />- Scraper: <br />- Dozer: <br />Cat 637G <br />NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: 1 <br />NA <br />Water Tanker, 2,500 Gal, <br />Cnst Rrnakrinwn• G Q7. 1, T,,...... r______ _ 1 <br />Total work team cost/hour: $798.93 <br />MATERIAL OUANTITIES <br />Initial volume: 20,651 CCY Swell factor: 1.000 <br />Loose volume: 202651 LCY <br />Source of estimated volume: Operator <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />1 v1 al 1U.G11alll.G <br />Motor Grader <br />t. Ul 111Gn1 <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />100 <br />Ownership cost/hour: <br />$107.02 <br />NA <br />NA <br />NA <br />NA <br />$7.43 <br />Operating cost/hour: <br />$238.65 <br />NA <br />NA <br />NA <br />NA <br />$22.11 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />Unit Subtotals: <br />$384.69 <br />NA <br />NA <br />NA <br />NA <br />$29.55 <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />1 <br />Group Subtotals: <br />Work: <br />$769.38 <br />Support: <br />$0.00 <br />Maint: <br />$29.55 <br />Total work team cost/hour: $798.93 <br />MATERIAL OUANTITIES <br />Initial volume: 20,651 CCY Swell factor: 1.000 <br />Loose volume: 202651 LCY <br />Source of estimated volume: Operator <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />1,6001bs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />To Soil <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />51.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />