My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-06_REVISION - M2005059 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005059
>
2015-02-06_REVISION - M2005059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:19 PM
Creation date
2/11/2015 8:52:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005059
IBM Index Class Name
REVISION
Doc Date
2/6/2015
Doc Name
FW Increase, S101
From
DRMS
To
Asphalt Specialties Co., Inc.
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 003 Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Backfill 5.5 ac in NE corner of permit <br />Site: Nelson Mining Resource Permit Action: Reclamation <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 1/27/2015 County: Weld <br />User: ECS <br />Agency or organization name: DRMS <br />Permit/Job #: M2005059 <br />Abbreviation: None <br />Filename: M059 -003 <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br />- Scraper: <br />Cat 637G <br />- Dozer: <br />NA <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />I NA <br />Cost Breakdown: Scraner Wnrk Team Crnnnnrt Fnninment mnintannnnp Fnninmant <br />Total work team cost/hour: $769.38 <br />MATERIAL OUANTITIES <br />Initial volume: 215,000 CCY Swell factor: 1.000 <br />Loose volume: 215,000 LCY <br />Source of estimated volume: Operator <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$107.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$238.65 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$384.69 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$769.38 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $769.38 <br />MATERIAL OUANTITIES <br />Initial volume: 215,000 CCY Swell factor: 1.000 <br />Loose volume: 215,000 LCY <br />Source of estimated volume: Operator <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,700 lb §/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Sand and clay - Loose <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />30.22 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.