Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Cost Summary <br />Site: Simla Highway Pit Permit Action: 2015 Update Permit/Job #: M1995095 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 2/4/2015 County: El Paso <br />User: TC 1 <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M095 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O 1 a <br />020 <br />030 <br />040 <br />Misc Grading <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1.72 <br />$360.00 <br />$8,266.00 <br />$20,246.00 <br />$3,961.00 <br />Topsoil Placement <br />SCRAPERI <br />32.44 <br />Reve e 9.9 acres <br />REVEGE <br />30.00 <br />Mob/Demob <br />MOBILIZE <br />3.70 <br />SUBTOTALS: <br />67.86 <br />$32,833 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$663.23 <br />Performance bond: <br />1.05% <br />Total = <br />$344.75 <br />Job superintendent: <br />0.00 hrs <br />Total = <br />$0.00 <br />Profit: <br />10.00% <br />Total = <br />$3,283.30 <br />TOTAL O & P = <br />$4,291.28 <br />CONTRACT AMOUNT (direct + O & P) = <br />$37,124.28 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00% <br />Total = $0.00 <br />Reclamation management and /or administration: <br />5.00% <br />$1,856.21 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $6,147.49 <br />TOTAL BOND AMOUNT (direct + indirect) = $38,980.49 <br />