Laserfiche WebLink
Aspect <br />Reclamation Operation <br />Quantity <br />Units <br />Unit <br />($) <br />Cost ($) <br />Miming Area 1 <br />F. <br />BackjUled, Ea&4 and seeded <br />1. Seed and mulch <br />11.5 <br />Ac <br />675 <br />7,763 <br />2. Reseed 20% <br />2.3 <br />Ac <br />675 <br />1 553 <br />Miscellaneous Aspects <br />G. <br />Roads and Conveyors <br />1. Demolition and removal of <br />Conveyor Bridge <br />I <br />LS <br />50,000 <br />501000 <br />2. Scarify compacted SELlInd <br />1 <br />Ac <br />25 <br />1 25 <br />3. Replace topsoil, 6" x 1.0 acres <br />807 <br />CY <br />0.85 <br />686 <br />4. Seed and mulch <br />1 <br />Ac <br />675 <br />675 <br />S. Reseed 20`/0 <br />0.2 <br />Ac <br />675 <br />135 <br />H. <br />Topsail and Overburden Stochpiles <br />1. Material removed for other <br />Aspects <br />0 <br />2. Seed and mulch <br />3.5 <br />Ac <br />675 <br />2,363 <br />3. Reseed 20% <br />0.7 <br />Ac <br />675 <br />473 <br />I. <br />Employee Facilities and Maintenance <br />Station <br />1. Scarify compacted Vound <br />0.5 <br />Ac <br />25 <br />13 <br />2. R lace il, 6" x 0.5 acres <br />403 <br />CY <br />0.85 <br />343 <br />3. Seed and mulch <br />0.5 <br />Ac <br />675 <br />338 <br />4. Reseed 20% <br />0.1 <br />Ac <br />675 <br />68 <br />otal Disturbance Costs <br />tractor Mobilization/Demobilization (8 %) <br />erhead (18.5 %) <br />ministration (5%) <br />0.08 <br />0.185 <br />0.05 <br />$394,936 <br />$31,595 <br />$73,063 <br />$19,747 <br />utai Pro ed Financial Warranty <br />5519 1 <br />'sturbed Acaeage <br />inanciai Warran Acre <br />31.8 <br />$ l6 331 <br />Warlake, <br />DMG 1/2 Permit <br />Page 25 <br />