Laserfiche WebLink
Scraper Worksheet Cont'd Task # 001 Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Grade Highwalls to 3:1 <br />Site: Apache 9 Permit Action: 2015 Update Permit/Job #: M1978009 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 2/5/2015 County: El Paso <br />User: TC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: I Cat 623G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: M009 -001 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: Cat D7R DS Series II LGP <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 12M <br />-Water Truck: Water Tanker. 2.500 Gal. <br />Cost Breakdown: Scraner Work Team Sunnort F.nuinment Maintenance F.nninment <br />Total work team cost/hour: $820.78 <br />MATERIAL OUANTITIES <br />Initial volume: 43,000 CCY <br />Loose volume: 48,375 LCY <br />Source of estimated volume: DMG 2005 Su <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />100 <br />NA <br />100 <br />100 <br />Ownership cost/hour: <br />$75.81 <br />NA <br />$49.84 <br />NA <br />$24.98 <br />$7.43 <br />Operating cost/hour: <br />$140.00 <br />NA <br />$83.32 <br />NA <br />$46.35 <br />$22.11 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$39.02 <br />NA <br />$38.85 <br />NA <br />$38.23 <br />$0.00 <br />Unit Subtotals: <br />$254.83 <br />NA <br />$172.01 <br />NA <br />$109.56 <br />$29.55 <br />Number of Units: <br />2 <br />0 <br />1 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$509.66 <br />Support: <br />$172.01 <br />Maint: <br />$139.11 <br />Total work team cost/hour: $820.78 <br />MATERIAL OUANTITIES <br />Initial volume: 43,000 CCY <br />Loose volume: 48,375 LCY <br />Source of estimated volume: DMG 2005 Su <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />55,200 pounds <br />Payload Capacity: <br />21.65 LCY <br />Swell factor: 1.125 <br />Increase <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />18.00 <br />LCY <br />Heaped Volume: <br />23.00 <br />LCY <br />Average Volume: <br />20.50 <br />LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />CIRCES Cost Estimating Software <br />