Laserfiche WebLink
Scraper Worksheet Cont'd Task # 002 Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Apply Six Inches of Topsoil to 65 Acres <br />Site: Apache 9 Permit Action: 2015 Update Permit/Job #: M1978009 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 2/5/2015 County: El Paso <br />User: TC 1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 623G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: M009 -002 <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: Cat D7R DS Series II LGP <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 12M <br />-Water Truck: Water Tanker, 2,500 Gal. <br />Cost Breakdown: Scraner Work Team Simnort Frniinment Maintenance Fnninment <br />Total work team cost/hour: $820.78 <br />MATERIAL QUANTITIES <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />100 <br />NA <br />100 <br />100 <br />Ownership cost/hour: <br />$75.81 <br />NA <br />$49.84 <br />NA <br />$24.98 <br />$7.43 <br />Operating cost/hour: <br />$140.00 <br />NA <br />$83.32 <br />NA <br />$46.35 <br />$22.11 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$39.02 <br />NA <br />$38.85 <br />NA <br />$38.23 <br />$0.00 <br />Unit Subtotals: <br />$254.83 <br />NA <br />$172.01 <br />NA <br />$109.56 <br />$29.55 <br />Number of Units: <br />2 <br />0 <br />1 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$509.66 <br />Support: <br />$172.01 <br />Maint: <br />$139.11 <br />Total work team cost/hour: $820.78 <br />MATERIAL QUANTITIES <br />Initial volume: 43,000 <br />CCY Swell factor: 1.115 <br />Loose volume: 47,945 <br />LCY <br />Source of estimated volume: <br />DMG 2005 Surety Increase <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,100 lbs/LCY <br />Struck Volume: 18.00 <br />LCY <br />Material description: Earth - Loam <br />Heaped Volume: 23.00 <br />LCY <br />Rated Payload: 55,200 pounds <br />Average Volume: 20.50 <br />LCY <br />Payload Capacity: 26.29 LCY <br />Adjusted Capacity: 20.50 <br />LCY <br />CIRCES Cost Estimating Software <br />