My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-02_INSPECTION - M2004051
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2004051
>
2015-02-02_INSPECTION - M2004051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:04 PM
Creation date
2/11/2015 8:15:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004051
IBM Index Class Name
INSPECTION
Doc Date
2/2/2015
Doc Name
Corrective Action Response
From
Aggregate Industries
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br />Reclamation Cost Estimate <br />In order to calculate maximum potential reclamation liability to the State, we have selected a <br />point in time where the mining disturbance could be at is maximum. This point occurs during <br />the mining of Phase I1I. At this time the active mining face and interior walls of the Pond 3 <br />mining area will be at its greatest length. There will be shoreline (exterior mine area wall) under <br />reclamation in the Pond 3 mining area. Please refer to Exhibit D for a listing of disturbed areas <br />that total 31.8 acres. This estimate will follow the same order as the listing in Exhibit D. <br />Aspect <br />Reclamation Operation <br />Quantity <br />Units <br />Unit Cost <br />($1 <br />Cost ($) <br />Pond 3 <br />A <br />Slurry Wall, 10,000 LFx 30 feet deep <br />�20 <br />60,000 <br />SgFt <br />3 <br />180,0(20016) <br />B <br />Stripped Overburden and Topsoil in <br />Anticipation ofA inin <br />1. Replace overburden, 6" x 10 acreas <br />8,067 <br />CY <br />0.85 <br />6,857 <br />2. R lace topsoil, 6" x 10 acres <br />8,067 <br />CY <br />0.85 <br />6,857 <br />3. Seed and mulch <br />10 <br />Ac <br />675 <br />6,750 <br />4. Reseed 20% <br />2 <br />Ac <br />675 <br />1,350 <br />C. <br />Active Yimng Face, 2, 000 eet <br />I. Backfill slope to 314:1 V <br />100,000 <br />CY <br />0.85 <br />85,000 <br />2. Replace topsoil above water level, <br />6" x 10 ft x 2,000 ft <br />370 <br />CY <br />0.85 <br />315 <br />3. Seed and mulch <br />0.5 <br />Ac <br />675 <br />310 <br />4. Reseed 20% <br />0.1 <br />Ac <br />675 <br />62 <br />D <br />Side slopes being BacVlled, 1,000 <br />feet <br />I. Backfill slope to 3H:1 V <br />50,000 <br />CY <br />0.85 <br />42,500 <br />2. Replace topsoil above water level, <br />6" x 10 ft x 1,000 ft <br />185 <br />CY <br />0.85 <br />157 <br />3. Seed and mulch <br />0.2 <br />Ac <br />675 <br />155 <br />4. Reseed 20% <br />0.0 <br />Ac <br />675 <br />31 <br />B <br />Top of Slope and Side Slope Seeding, <br />1, 000 eet <br />1. Seed and mulch <br />0.2 <br />Ac <br />675 <br />135 <br />2. Reseed 20% <br />0.0 <br />Ac <br />675 <br />27 <br />Waamrbn lakes <br />DMG 112 Pamit <br />Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.